納期遅れに対するペナルティを考慮した受注生産システムの最適発注方策に関する一解法
竹本 康彦有薗 育生
著者情報
ジャーナル フリー

2005 年 18 巻 3 号 p. 100-107

詳細
抄録

Manufacturing systems are classified into make-to-stock (MTS) systems and make-to-order (MTO) systems. In particular, the MTO manufacturing systems have been applied to many enterprises in order to react to consumer's uncertain demands and various requirements. Until now, in the studies for the order splitting policy to some original equipment manufacturers (OEMs) under the MTO manufacturing systems, the expectation of the lead time has been mainly considered. In general, the lead-time has the variability because of the fluctuations of the processing time and the demand. Therefore, when the optimal operation of the MTO manufacturing systems is investigated, we should consider the possibility of the delay for the appointed date of delivery of products. In this study, taking the penalty of the delay of delivery into consideration, we investigate the order splitting policy to two OEMs having the difference in the processing cost and the capacity.

著者関連情報
© システム制御情報学会
前の記事 次の記事
feedback
Top